One of the major company profile is the realization of complex and innovation projects concerning processing equipment engineering, supply, installation and service for industrial and energetic enterprise.
 
We can offer our clients the following set of services:
- designing;

- safety assessment;

- environmental impact assessment;

- technical and working documentation preparation;
- selection and supply of complete equipment;
- special equipment production;
- installation, setting-up, commissioning of purchased equipment;
- theoretical and industrial personnel training;
- engineering services.

ACCOMPLISHED PROJECTS
REPRESENTED COMPANIES  

Our qualified specialists and long experience in this field allow to realize projects of any complicacy qualitatively and quickly. All the offered services and equipment comply with up-to-date safety and quality standards. Currently, money equivalent of developed by JSC" Specialus montažas-NTP" projects is of 45 mil. euro.



2014 – 2015 y.  Design and Construction of Sites for management of Materials from the Decommissioning Activities at Kozloduy NPP Units 1-4 (Project 19-4)

Employer: Radioactive Waste SE (Bulgaria)

Financing: Kozloduy International Decommissioning Support Fund (KIDSF) administrated by the European Bank for Reconstruction and Development (EBRD)

Project Description:

The Project 19-4 is carried out in the Republic of Bulgaria at Kozloduy NPP Units 1 - 4. The main task of the Project is:

1. Development of the Design of Sites for interim storage of the materials generating during decommissioning activities at Kozloduy NPP Units 1 - 4.

2. Development of Environment Impact Assessment Report.

3. Construction of the Sites.

4. Manufacturing and installation of the equipment.

5. Commissioning of the Sites.

Our Company acts as a member of the Partnership which also includes Bulgarian companies Korekt Ltd and Jung Ltd (leader). Contract between the Partnership and the State Enterprise Radioactive Waste SE entered into force on March 5, 2014.

 

2012 – 2013 y.  Feasibility Study for the Management of V1 NPP Primary Circuit Components (D7.1)

Client: JAVYS (Jadrova Vyradovacia Spolocnost, a.s.)

 

Financing: BIDSF (Bohunice International Decommissioning Support Fund)

 

Description of the Project:

The project D7.1 takes place in Slovak Republic on the Bohunice V1 NPP and on the Mochovce NRR.

 

The main objectives of the Project D7.1 are to develop and compare the alternative solutions for the management of the Large Components of Primary Circuits of the two Units of V1 NPP towards their dismantling and subsequent waste management, provide Client’s decision-makers with sufficient information on high-ranked alternatives resulting from their comparative analysis, in order to justify their acceptance for implementation and elaboration of the PO SAR Upgrade Proposal for concerned nuclear installations.

 

Our company is the leader of a partnership which also includes Lithuanian Energy Institute (Lithuania), All-Russian Research Institute for Nuclear Plants Operation (Russian Federation) and RELKO Ltd (Slovakia) as sub-contractor.

 

BIDSF Contract No. 019 4 001 between the partners headed by JSC "Specialus montažas-NTP" and JAVYS came into force on 25th of July, 2012.

 

2008 - 2012 y.  “Landfill” facility for short-lived very low level waste (B19)

Employer:  SOE „Ignalina NPP“

Investment: EU Structural Funds. Ignalina Programme

Description of the project:

Technical and detailed designs of the Buffer Storage with capacity of up to 4000 m3 were developed and the facility itself was built within the framework of Ignalina NPP decommissioning and will be operated on the INPP territory. This is an enclosed structure covering 0.2 ha and equipped with a characterization facility enabling radiological measurement of delivered waste. It is also provided with systems for transporting and temporarily storing waste.

 

On April 25-27, 2012 the facility successfully underwent “hot” tests (tests employing real waste). The tests were carried out to the extent intended by the program agreed by VATESI. In the course of the tests containers and packages holding radioactive waste were delivered to the storage, underwent radiological measurements and emplacement for temporary storage. The tests have shown the possibility of safe handling of all types of radioactive waste packages intended by the project and compliance of facility performance with design values.

 

Within the framework of the same project (B19) we have also developed technical and detailed designs of the Landfill repository for short-lived very low level waste. The projects successfully passed two inspections and agreement by Visaginas municipality.

 

To fulfill its commitments as a general contractor our company cooperates with the following partners (subcontractors): Lithuanian Energy Institute (Lithuania), Pramprojektas, JSC (Lithuania), Vilstata, JSC (Lithuania), Hidroprojektas, JSC (Lithuania), and RADICO, LLC (Russia).

 

  BACK 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

Copyright © 2008. Specialus montažas - NTP All rights reserved.